Minimum Energy Intelligence (MEI): 8-Year Coin-Cell Budget Math, -20 °C Brownout Simulation, and All Five Event Counts

Product/CAD simulation audit (est_j, 0 physical tags cycled): shows exact 8-yr 10 uW = 2.52 kJ vs CR2032 ~2.38 kJ cold-derated capacity math and reconciles 10,000 wakeups, 500 beacons, 490 refusals, 40/40 cold alerts, and 2,680 JCR-1 receipts.

David Charlot • • 7 min read • Glossary • Verification & AI-Use Disclosure
mei cold-chain coin-cell est-j grant-sharding embedded-systems

Primary Source: Primary Product Review: research.openie.dev/products/mei/ · Canonical Digest: blake3:tv:33f41b6dafca0a637986a28756e35c305743509289ac7774cfb84fcbc91804cb · Telemetry Class: est_j (Analytical datasheet + impedance simulation only (est_j, board_metered = false; zero physical coin-cell boards tested))

Unattended Gate Flag (human_in_gate = false): Automated build, benchmark, and proof-checking scripts ran without manual human override; signed & self-checked by OpenIE — not independently peer-reviewed (Verification & AI-Use Disclosure · Glossary).

Inline Evidence Tags: [T] machine-checked Lean 4 theorem over stated axioms · [E] empirical benchmark or hardware log · [M] analytical/mathematical model or simulation · [S] external literature, filing, or specification citation.

Minimum Energy Intelligence — 8-year 2.52 kJ vs CR2032 cold derating math and 40/40 -20 C simulated alert survival

Datasheet/CAD cold-chain simulation (est_j): explicit 2.52 kJ 8-year budget vs. CR2032 derating and reconciled 10,000 / 500 / 490 / 40 / 2,680 event counts.

Key Claims & Evidence Tags

  1. [M/S · Explicit 8-Year Coin-Cell Arithmetic (est_j)] 10 uW × 8 yr × 3.15576 × 10^7 s/yr = 2,524.6 J ≈ 2.52 kJ (the primary review’s 9.9 uW STM32U3 + duty-cycled BME690 schedule spends 312 J/yr = 2,499 J over 8 yr). Candid battery gap: a standard 3.0 V, 220 mAh CR2032 holds ~2,376 J nominal (2,430 J at 225 mAh in cad-sim, 2,538 J at 235 mAh +21 °C datasheet) before ~1%/yr self-discharge and cold impedance derating (2,193 J usable to 2.0 V at +25 °C, 2,059 J at +4 °C, and 0 J unbuffered under 12 mA BLE TX pulses at -20 °C where internal resistance R_int jumps 6x from 12.0 ohm to 71.78 ohm, sagging terminal voltage to 1.951 V < 2.00 V brownout). True 8-year service therefore requires either < 5 uW duty-cycled sleep (5.1 uW with nRF54L15 = ~1.29 kJ over 8 yr) or a larger CR2477 / Li-SOCl2 primary cell plus a pulse buffer capacitor.
  2. [M/E · All Five Event Counts Reconciled (10,000, 500, 490, 40, 2,680)] Each simulated ambient trace (+25 °C, +4 °C, -20 °C) steps 10,000 scheduled sensor wakeups containing 500 routine BLE beacon attempts and 40 safety-critical temperature-excursion alert attempts (540 radio attempts/trace). At -20 °C, two-phase hold/settle grant sharding (35 mJ safety reserve) refuses 490 of 500 routine beacons (10 allowed) so 40 / 40 (100%) safety alerts succeed (vs. brownout collapse on an unsharded baseline). Because each allowed TX writes 2 JCR-1 receipts (hold + settle) and each refusal writes 1 receipt, the three traces emit 1,080 (+25 °C: 540 × 2) + 1,010 (+4 °C: 470 × 2 + 70) + 590 (-20 °C: 50 × 2 + 490) = 2,680 Ed25519-signed det-CBOR JCR-1 receipts.
  3. [M · Simulation Scope Disclosure] Every tag and campus-fleet number in mei comes from component datasheets (STM32U3, nRF54L15, BME690, Energizer CR2032) and discrete Python/Rust simulation (est_j, board_metered = false); no physical tag has undergone environmental chamber testing.

Methods, Baselines & Artifact Scope

Methodological DimensionPrimary-Paper Grounding & Scope
Hardware & TelemetryAnalytical/simulated (est_j, board_metered = false, measured_j = null). Component parameters drawn from published STM32U385, Nordic nRF54L15, Bosch BME690, and Energizer CR2032 temperature-impedance datasheets.
Workload & Benchmark SuiteThree 10,000-wakeup cold-chain excursion simulations (+25 °C, +4 °C, -20 °C), each scheduling 500 routine BLE status beacons + 40 critical excursion alerts (1,620 total TX attempts, 2,680 JCR-1 receipts).
Baseline(s) ComparedUnsharded greedy FIFO battery consumption (which exhausts pulse headroom on routine beacons and drops -20 °C safety alerts via V_term < 2.00 V brownout) vs. two-phase hold/settle safety-reserve grant sharding (35 mJ reserve + 100 uF–470 uF pulse buffer model).
Runs (N) & Spread / UncertaintyDeterministic 1-scenario-per-temperature trace (N = 3 temperatures × 10,000 wakeups; Spread: Monte Carlo cell-to-cell R_int manufacturing variance not modeled in single-curve datasheet simulation).
Caching / Cold vs. Warm ScopeNot a caching workload; models electro-thermal battery internal-resistance (R_int) transitions from warm +25 °C (12.0 ohm) to cold -20 °C (71.78 ohm).
Artifact & License AvailabilityArchitecture review and simulation tables public (CC0-1.0) at research.openie.dev/products/mei/; det-CBOR/Ed25519 primitives in openIE-dev/openie-artifact-substrate (Apache-2.0); CAD/simulation repo partially internal.

8-Year Coin-Cell Energy Arithmetic & Cold-Chain Derating

Critique #6 flagged that 10 uW continuous power over 8 years exceeds a real CR2032 once derating is included. Showing the full ledger from src/content/products/mei.md confirms that critique [M, S]:

  • Demand side: 10.0 uW × 8 × 365.25 × 86,400 s = 2,524.6 J (2.52 kJ; at 9.9 uW = 2,499 J, plus BLE TX bursts) [M].

  • Supply side (CR2032, 3.0 V nominal): 220 mAh = 792 C ≈ 2,376 J (225 mAh = 2,430 J; 235 mAh Energizer datasheet = 2,538 J at +21 °C low-drain). After ~1%/yr shelf self-discharge (~8% over 8 yr) and 2.0 V cutoff impedance losses, usable energy drops to 2,193 J at +25 °C and 2,059 J at +4 °C; at -20 °C without a parallel pulse capacitor, R_int = 71.78 ohm causes immediate 12 mA TX brownout (1.951 V < 2.00 V, 0 J unbuffered radio capacity) [M, S].

  • Engineering consequence: Achieving an 8-year sealed cold-chain rating requires either lowering quiescent draw to ~5.1 uW (~1.29 kJ over 8 yr, e.g., nRF54L15 + sparser gas-sensor duty cycling) or stepping up to a CR2477 (1,000 mAh ≈ 10.8 kJ) / Li-SOCl2 primary cell paired with a low-leakage pulse buffer capacitor [M, S].

Reconciling All Five Simulation Event Counts (10,000 / 500 / 490 / 40 / 2,680)

The five integers in earlier summaries come from one accounting identity across the three simulated temperature traces (+25 °C, +4 °C, -20 °C) [E, M]:

  • 10,000: Total scheduled sensor-check wakeups per temperature trace.

  • 500 and 40: Scheduled routine BLE status beacons (500) and critical cold-chain excursion alerts (40) inside each 10,000-wakeup trace (540 total TX requests/trace).

  • 490 refused / 40 preserved (-20 °C): Under -20 °C impedance derating, the routine shard exhausts after 10 beacons and refuses 490 routine beacons (1 refusal receipt each), protecting the 35 mJ emergency reserve so all 40 / 40 critical excursion alerts transmit cleanly (50 total allowed sends × 2 receipts + 490 refusals × 1 receipt = 590 receipts at -20 °C).

  • 2,680 total JCR-1 receipts: Summing +25 °C (540 allowed × 2 = 1,080), +4 °C (470 allowed × 2 + 70 refused = 1,010), and -20 °C (50 allowed × 2 + 490 refused = 590) equals 2,680 deterministic CBOR (det-CBOR) Ed25519-verified receipts [E].

Limitations & Chamber Validation Requirements

  • Zero physical hardware measurements (est_j only): Passivation-layer growth on lithium anodes, MLCC DC-bias/low-temperature capacitance loss (X7R/X5R at -20 °C), crystal startup drift, and flash write wear must be measured in environmental chamber hardware (LA-F / MEI-F bench protocol) before any production lifetime claim is made [M].

Energy & Telemetry Scope

Strictly est_j (board_metered = false, measured_j = null, reported_j = null), modeled from vendor datasheet curves.

  • Hester & Sorber (Flicker / Ekho, SenSys 2017) & Colin et al. (Capuchin / Chain, OOPSLA 2016): Intermittent energy-harvesting/buffered MCU task atomicity and capacitor sizing [S].
  • Zeng et al. (ECOSystem, ASPLOS 2002) & Roy et al. (Cinder, EuroSys 2011): Reserve-and-tap energy-budget allocation adapted here as two-phase hold/settle radio sharding [S].
  • Energizer CR2032 / CR2477 Technical Bulletins, STMicroelectronics STM32U3 & Nordic nRF54L15 Datasheets: Primary electrochemical pulse-impedance and sleep-current specifications [S].
DC

David Charlot

Open Interface Engineering, Inc. · Signed Provenance · Self-Checked

Product architecture review and simulation ledger CC0-1.0 on research.openie.dev/products/mei/; receipt signing primitives in openIE-dev/openie-artifact-substrate (Apache-2.0); no physical PCB fabricated. Full licensing & AI-use disclosure →

Datasheet & CAD Simulation (est_j) · No Physical Tag Built

Check the primary artifacts or run an independent replication

Inspect signed provenance manifests, rerun our public Apache-2.0 commodity-hardware replication kits, review our November 25, 2026 outside-review errata, or browse primary manuscripts on the Research Hub.