Task Satiation vs. Aggregate Jevons Rebound: Bounded UnitSpecs Meet Elastic Fleet Demand

Separates per-task verification satiation (where extra compute after C(z)=1 adds zero utility) from macro-scale Jevons rebound, where cheaper per-task AI historically expands total electricity demand.

Task Satiation vs. Aggregate Rebound — Per-Task Satiation [M] vs. Macro Jevons Rebound when Elasticity > 1 [S] (unmetered economic synthesis)
Analytical separation between single-task specification satiation and fleet-wide Jevons rebound (joules = null, unmetered).

Temporal & Archival Scope: Era II OpenIE Study (November 20, 2026) · Canonical OpenIE Chronicle Entry: https://blog.openie.dev/posts/satiation/ · Primary Paper & Methods: https://research.openie.dev/papers/satiation/ · Canonical Digest: blake3:tv:3ea9cd43444f33d5bae2a87a6c253bc8b45889597003b30a4b10f956c078b304

Provenance & Telemetry Hygiene: Signed Provenance · Self-Checked (automated OpenIE internal gates; not externally peer-reviewed) · Energy Class: unmetered (measured_j ⊥ reported_j ⊥ est_j ⊥ unmetered — Verification, Licensing & AI-Use Disclosure · Glossary & Non-Mixing Rules).

Key Claims & Evidence Tags

  1. [M · Micro-Level Task Satiation] On any task governed by a sound binary completeness check C(z) = 1 (such as an exact compile+test repair or proved theorem), marginal utility of extra tokens after the first verified hit is zero—contrasting with open-ended creative or adversarial loops that lack a stopping criterion.
  2. [M/S · Macro-Level Rebound Caveat] Micro-efficiency does not guarantee lower grid electricity: under the standard elasticity identity d ln E_total / d ln eta = epsilon_d - 1, cutting joules per task expands the set of economically viable automated workflows and raises total fleet power whenever demand price elasticity epsilon_d > 1 (backfire / Jevons paradox).
  3. [S · Empirical Macro Context] Synthesizes Nordhaus (1996) lighting lumen-price history (> 1,000x efficiency gain paired with rising total lighting electricity share) and IEA (2024/2026) global datacenter electricity projections (~415 TWh toward ~945 TWh by 2030).

Methods, Baselines & Artifact Scope

Problem: Why Micro-Efficiency Claims Overshoot Macro Grid Reality

Engineering blogs routinely extrapolate a 10x or 100x kernel energy reduction into an equivalent cut in global datacenter power. satiation was written specifically to reject that naive extrapolation [M, S]. By separating the intensive margin (joules spent to close one fixed task) from the extensive margin (how many tasks society chooses to run once each task costs millicents instead of dollars), the paper reconciles bounded per-task verification with rising aggregate AI power draw [M, S].

Two Regimes: Bounded UnitSpecs vs. Elastic Extensive Margins

Limitations & Unresolved Elasticity Parameters

Energy & Telemetry Scope

This study is unmetered (joules = null, board_metered = false); datacenter terawatt-hour figures (~415 TWh to ~945 TWh) are cited directly from International Energy Agency (IEA) reports [S].


Canonical Provenance, Primary Artifacts & Independent Replication